In early 2024, Stericycle — a regulated waste management and secure information destruction company with more than 13,500 employees — had a deadline that couldn’t be negotiated: its data center contract expired on August 1, 2024, with an automatic one-year renewal if not canceled in time. The original plan was to migrate to VMware Cloud on AWS, but an industry shift forced a rapid pivot to native Amazon EC2 services. The team that executed that pivot: five people.
The challenge: against the clock, with two-decade-old systems
The scope wasn’t trivial: 450+ production servers, mission-critical healthcare applications, legacy systems dating back to 2003, complex networking dependencies, and compliance-sensitive workloads. All of it under a fixed deadline that left no room to slip.
The three-pronged strategy
- AWS Application Migration Service (MGN) automated server replication and minimized downtime, maintaining application consistency across modern and legacy systems alike.
- The Experience Based Acceleration (EBA) methodology structured the migration into five manageable waves, each building on lessons from the previous one — instead of trying to move all 450 servers at once.
- An iterative approach let the team validate each wave before moving to the next, reducing the risk of one mistake rippling across the whole project.
Why this is more relevant to an SMB than a large corporation’s case
Most published migration cases show large teams and corporate budgets. Stericycle shows the opposite: a small team, a fixed, non-negotiable deadline, pulling off a migration of hundreds of servers without hiring additional staff — exactly the resource reality most mid-size companies in Peru operate under.
How we do it at 1 MSP
- We bring the specialized team an SMB doesn’t need on payroll year-round, only when a migration needs to execute.
- We migrate in waves, not all at once, so each phase gets validated before moving to the next.
- We handle legacy systems without requiring you to modernize them first — migration and modernization can be separate projects, in whatever order makes sense for your business.
Figures and timeline correspond to Stericycle’s case as documented by AWS; every migration has its own complexity.
Would your IT team need to grow to execute a migration, or can it lean on a provider that already has that team? Book your free diagnostic or check out our managed AWS solution.
FAQ
Can a small team really carry a migration at this scale?
Stericycle’s case shows it in practice — a 5-person team didn’t manually migrate each server one by one, they used an automated replication tool (AWS MGN) and a phased methodology instead of human brute force.
What happened with the legacy systems from 2003?
The same migration service (AWS Application Migration Service) handled both modern and legacy systems, maintaining application consistency during the migration — they didn’t have to rewrite or modernize the old systems before moving them.
Does this apply to regulated sectors, like healthcare, with sensitive workloads?
Yes — Stericycle runs mission-critical healthcare applications and compliance-sensitive workloads, and the migration executed without significant disruption to those operations.