Cornerstone OnDemand migrated six data centers — 1,500+ servers, roughly 35,000 databases, 4 petabytes of data, 8 billion files — to 11 AWS Regions, serving 140 million users across 186 countries. Most of its customers never noticed the transition. What’s interesting for an SMB isn’t the scale — it’s that the three reasons that pushed them to migrate are exactly the ones any mid-size company already has today, just at a fraction of the size.
The 3 signals that pushed the migration
- The data center contract renewed itself. If not canceled in time, the contract auto-renewed — with renewal costs in the millions. The same logic applies to a company that renews its hosting or colocation contract every year without questioning it.
- Hardware couldn’t keep up anymore. Capacity utilization exceeded 85% across primary data centers — the hardware refresh cycle couldn’t keep pace with customer growth. For an SMB, this looks like servers responding slower and slower at peak hours.
- Old infrastructure couldn’t support AI. With no GPU support or modern orchestration, they couldn’t deploy new AI/ML capabilities. Every month of delay widened the gap between what customers expected and what the platform could deliver — the same problem any company adopting AI on decade-old infrastructure faces.
The approach that made a migration this size possible without disruption
Cornerstone used the AWS Migration Acceleration Program (MAP) 2.0 framework along with custom migration automation. Most customers experienced minimal-to-zero impact during the transition — the goal wasn’t migrating fast at any cost, it was migrating without the business feeling it.
Why this matters for a much smaller company
It isn’t about replicating the scale — it’s about recognizing the pattern. If your company has an infrastructure contract that renews out of inertia, servers that can’t keep up anymore, or wants to adopt AI but its current infrastructure won’t allow it, you already have the same 3 signals Cornerstone had — before they turn into a crisis instead of a planned decision.
How we do it at 1 MSP
- We assess whether your company already has any of these 3 signals, before they become an emergency.
- We design the migration in phases, so your operation doesn’t feel the transition — the same principle behind much larger migrations.
- We manage AWS as part of your full infrastructure, not as a project that gets delivered and abandoned.
Figures and details of the case correspond to Cornerstone OnDemand’s migration as documented by AWS; every migration has its own complexity and timeline.
Does your company already show any of these 3 warning signs? Book your free diagnostic or check out our managed AWS solution.
FAQ
Does this apply to a company much smaller than Cornerstone?
The 3 signals that pushed them to migrate don’t depend on scale — a data center contract that auto-renews, hardware that can’t keep up, or not being able to use modern AI tools because of old infrastructure happen just the same at a 50-person company.
How long does a migration like this take?
Cornerstone’s case is at a much larger scale than an SMB’s — what matters isn’t the exact timeline, but that they used a phased framework (AWS MAP 2.0) that lets you migrate without end users noticing the transition, which applies at any scale.
Do I need 11 AWS regions for this to be relevant to me?
No — most Peruvian SMBs operate in a single region. The value of the case is in the pattern of the 3 warning signs and the phased approach, not in Cornerstone’s specific scale.